CR13 - Bright Hill [CR117]

 


Station statistics
Station name - Bright Hill
Abbreviation - BRH
Station code - CR13

Dimensions
Length - 330 m
Width - 43 m
Depth - 24 m

Station layout details
Tracks - 2
Platforms - 2
Platform layout - Side platforms
Track layout - Mainline tracks in the centre served by 2 platforms
Levels - 2 underground levels (B1 - Mezzanine & B2 - Platform cum concourse)

Connection to Thomson-East Coast Line (TEL)
Provisions were made during the construction of the TEL station for future connection with the CRL station. A stub corridor tunnel was constructed, along with additional escalators and lifts to facilitate paid transfers between the station buildings.

25 January 2019 - A view of stub tunnel behind the temporary wall at the TEL Bright Hill station.
This was during a tour of the then under construction station during the announcement of the CRL1
alignment.
25 January 2019 - A view inside the stub transfer corridor tunnel.

25 January 2019 - A view inside the stub transfer corridor tunnel.

Exits (Total 8 exits, 4 new under this contract)
Exit 5 - Blk 408
Exit 6 - Khor Meng San Temple
Exit 7 - Opposite Khor Meng San Temple
Exit 8 - Bishan-Ang Mo Kio Park carpark

Contract statistics
Contract number - CR117
Contract type - Design & build
Contract scope - Stations, tunnels to Teck Ghee station & cut and cover tunnel section west to connect with TEL for transfer of engineering trains

Awarded contractor - Penta Ocean

Renders


A render of Exit 5 of the station.

A render of Exit 5 at B2 level.

Information from CRL1 Hougang Project Information Centre









Tunneling Progress

July 2025

Site images

First published on 28 July 2025
Updated 10 August 2025
Updated 23 August 2025