Wednesday, October 30, 2019

Pre-construction - Pasir Ris

Currently a terminal station serving a single line, the Pasir Ris station will be transformed into a transfer point between the East West Line and upcoming Cross Island Line. This station is also where the Cross Island Line splits between the main line towards Tuas and the branch line towards Punggol. Adopting a stacked station configuration, the main line tracks will occupy the upper platform level while the branch line tracks take up the lower platform level.

25 February 2019 - An aerial view of the existing EWL station.



25 February 2019 - A view of the junction of Pasir Ris Drives 1 & 8.

25 February 2019 - A view of Pasir Ris Street 51.

25 February 2019 - A view of Pasir Ris Drive 1 along the Town Park.

25 February 2019 - A view of the southern end of the Pasir Ris EWL station & Pasir Ris Central.

25 February 2019 - A view of the southern end of the EWL station platform.

25 February 2019 - A view of Exit B prior to closure.

25 February 2019 - A view of the interior of the Pasir Ris bus interchange.

25 February 2019

25 February 2019 - A view of the exterior of Pasir Ris bus interchange.

This post was prepared on 30 October 2019 but was only published on 7 October 2022. This post will not be cross-posted on SgMC Instagram.

No comments:

Post a Comment