CP03 - Riviera [P103]

 


Station statistics
Station name - Riviera
Abbreviation - RIV
Station code - CP3

Station dimensions
Length - 256m
Width - 50m
Depth - 32m

Station layout
Tracks - 2
Platforms - 2
Platform layout - Side platforms
Track layout - Regular underground side platform station
Levels - 3 underground levels (B1 - Concourse, B2 - Mezzanine & B3 - Platform)

Exits - 4 total

  • Exit 1 - Riviera LRT station, along Punggol East southbound carriageway
  • Exit 2 - Riviera LRT station, along Punggol East northbound carriageway
  • Exit 3 - Blk 161A, along Punggol Central westbound carriageway
  • Exit 4 - Blk 651, along Punggol Central eastbound carriageway

TBM Facts
Number used – 1
Machine type – Large Earth Pressure Balance
Machine diameter – 12.66m
Drives - 2 (1st drive from Cripple Siding to Punggol, 2nd drive from Cripple Siding to Elias)

Contract statistics
Contract number - P103
Contract scope - Riviera station & tunnels between Punggol & Elias station

Awarded contractor - Taisei - China State Construction Engineering Co JV
Contract type - Design & Construct

Renders










Information from CPE Punggol Project Information Centre