Pre-qualification for 8 contracts along the Cross Island Line (CRL) phase 2 has begun. Details of the pre-qualification for the contracts was released on 31 May 2022. With an expected closure date of 28 June 2022, it is highly likely that the stations along this section of the line will be officially announced this year.


An excerpt of the contracts for pre-qualification

We understand that there will be approximately 6 stations located in this phase which continues the line from Sin Ming westwards. The end-point of this phase is likely to be within the Jurong Lake District. An earlier tender floated for contract CR202, for the construction of a large diameter bored tunnel between Sin Ming Walk and Fairways Drive is also unlikely to be included in this pre-qualification exercise. Hence the CRL2 section should consist minimally of at least 9 contracts.

Do stay tuned as we update on potential station locations for this section in time to come.

2 comments:

  1. I'm kinda expecting one of the CRL2 Stations will be an interchange with the Downtown Line.

    ReplyDelete
    Replies
    1. King Albert Park will be the interchange with CRL2