30 March 2023 |
Our last update for Pasir Ris East station under contract CR107 was at the end of 2022. We made a visit right at the end of Q1 2023 and are ready to present to you an update of the site. Since the road closure of a stretch of Pasir Ris Drive 1 between Pasir Ris Drives 2 and 4, work has taken over the former roadway.
Various activities are taking place along the entire stretch with the arrival of hydrofraise frames and a clam shell grabber machine to facilitate diaphragm wall works. There do not appear to be betonite slurry silos or a treatment plant on site yet, hence it is unlikely that these works will begin so soon.
Meanwhile, works for the base of the eventual 10 to 12 metre tall noise barriers can be seen. Concrete bases have been built at various locales, but the installation of the barrier has yet to begin. Photos available after the jump.
30 March 2023 - Hydrofraise frame on site. |
30 March 2023 - A clam shell grabber machine on site. |
30 March 2023 - Clam shell grabber machine seen from street level. |
30 March 2023 - The concrete base will serve to support the noise barrier that will be installed here. |
30 March 2023 - Machinery on the former roadway. The paved roadway will be cleared to allow excavation works for the station box to commence. |
30 March 2023 |
30 March 2023 |
30 March 2023 - A view of construction in front of Whitesands Primary. |
30 March 2023 |
30 March 2023 |
30 March 2023 - A view of the former pedestrian overhead bridge across Pasir Ris Drive 1. |
30 March 2023 |
30 March 2023 |
30 March 2023 |
30 March 2023 - Concrete base for the noise barrier under construction. |
30 March 2023 - Looking eastwards at the construction progress. |
30 March 2023 |
30 March 2023 - The concrete base to support noise barriers on the opposite side of the road. |
30 March 2023 |
30 March 2023 |
30 March 2023 - Sidewalk has been demolished for utility relocation works. |
30 March 2023 - A view of the bus stop & pedestrian overhead bridge near Pasir Ris East CC. |
30 March 2023 - A view of a relocated bus stop . |
We hope this gives you an idea of the progress at the contract CR107 station site. Do stay tuned as we bring you more updates over time.