21 September 2023 - A view of the station site at the town centre of Serangoon North. Exit 1 will be located there. |
The major change that took place over the past quarter was the commencement of diaphragm wall excavation at the Exit 1 site. Located right smack in the heart of the town centre, this will be the site of the main station entrance. Formerly some pile load testing was conducted here before the betonite silos moved in. Subsequently, a hydrofraise machine was also brought in to begin set up. Excavation for the diaphragm wall panels has since begun in Q3 2023.
Further along towards the eastern end of the station is Exit 4, which is located adjacent to Bowen Secondary School. The work site here has made progress with noise barriers being installed and a road diversion implemented. Across the road from the school, work is being carried out with the installation of sheet piles - this may potentially be used as a retaining wall to divert the roadway for the excavation of the station box and mined subway. Over at other sites, preparation has also been carried out ahead of the commencement of diaphragm walling works.