Sunday, September 1, 2024

CR203 - New Turf City station renders

 

Layout of Turf City station and its exits.
Source: STEC

Contract CR203 for the construction of Turf City station was one of the last to be awarded for the second phase of the Cross Island Line (CRL). Since the contract's award in May 2024, contractor Shanghai Tunnel Engineering Co (STEC) has since uploaded some images of the station onto its website, including new renders of the station's exterior & interior.


A render of one of the station's exits. Based on STEC's diagram, this would be Exit 1.
Source: LTA


A render of the station's exit.
Source: LTA

A render of the station's interior.
Source: LTA

A render of the station's interior at the platform level. Artwork can be seen adorning the feature
wall space above the void.
Source: STEC

A render of the station's interior at concourse level. This render appears to show the other end
of the station from LTA's earlier render.
Source: STEC

A render of the station's exit - likely to be Exit 2.
Source: STEC

A render of the exterior of Exit 1.
Source: STEC

The new renders by STEC show the station's exterior as well as the interior's concourse and platform levels. It appears that the station has a symmetrical design, with the escalators located on the outer-most ends, with staircases and lifts towards the middle.

This post is also available on Instagram & Facebook.

No comments:

Post a Comment